Hi,
When I tried to run MF30 (create preliminary cost estimate) for material 1234 (FERT) in mth of Nov'07, I have encountered error msg CK241 "Value of cost component split is less than zero".
I have checked to the material BOM, there are 2 items A & B. B is a scrap material where the quantity entered is -2,000KG. Both items were ticked for "Relevant to costing" but unticked for "Co-Product" in BOM. There is costing run at end of Oct'07 for material 1234 and the result as below:-
Total value Quantity
Material 1234 37.88 1,000pc
A 0.00 1,000SH
B -872.00 -2,000KG
But when I tried to run MF30 again for material 1234 in mth of Dec'07, system seems able to accept the creation of preliminary cost estimate. I have checked for the following items:-
1) BOM -> no changes
2) Error msg in customising -> no changes make to msg CK241 (eg to change from error to warning)
3) Costing run -> no changes
Since everything remained no change, wandering why system suddenly can accept the creation of preliminary cost estimate.
Thanks.