Manual PR need to control

102 Views

Hi expert,

pls help me, is it possible that the Material planner field in PR can be controlled?

i understand that MRP controller field can be copied from material master, but in case of manually creation, we need the PR to be route for approval. SPRO setting for PR approval is not include the MRP controller in Material master. meaning the MRP controller for Manual PR is different (it represents the requestor of each dept).

appreciate your reply.

regards,

Maia