Skip to Content
0
Former Member
Jan 14, 2008 at 02:29 PM

Material Master Locking

22 Views

Is there any way to configure the system so that plant level material data can be maintained (MM02) by two different users for two different plants at the same time? Currently, the system locks the material before you even specify what org levels you want to work with so it doesn't appear this would be possible.