Skip to Content
0
Former Member
Jan 11, 2008 at 11:24 AM

BPM with sofware component dependency issue

23 Views

Hi ,

I have all abstract interfaces in the sotware component A and interface mapping,message mapping and BPM is in the Software component B.Software component B has the dependency with A.In my BPM container variables I am able to refer the abstract interfaces from the software component A.But in the transformertion step inside the bpm,eventhough the container variables and the souce , target messages interfaces refers the same interface and namespace it gives an error at design time. Is there any constraint in BPM ie: abstract interfaces which we have used in BPM should be in the same namespace where BPM resides.

Thanks in Advance

Regards,

Ravi