on 11-03-2017 5:43 PM
Hello
Can anywone tell me which is the usage for the option "No Update" at the "Price update" tab of transaction OKKI (Costing type definition). e ?
If I set this option to a Costing type XX, and select this costing type XX as a part of OKKN costing variant... when execution CK40N process, which would be the results?
My concern is: I need to execute a Product Cost calculation (CK40N) in order to release it at certain date, but with no FI accounting document posting for the Stocks adjustements.
Why? Because I want to execute that Posting on a posting period different than the Cost estimate validity period.
Example:
I need to get the Product cost calculation by 30.09.2017 in order to valuate stocks at the current costs at the end of September.
I execute then CK40N on 30.09.2017 to get new costs at the end of September.
But the new Cost estimation should be valid from 01.10.2017 until 31.10.2017 -
Is it possible to do that in some other way?
I wan to know if using "No update" option in the Costing Type would allow me to not post any stocks adjustements at the Product Cost Estimate calculation.
Thanks a lot in advance for you help!
IVAN MIRCO