Measuring Point in Maintenance Plan

505 Views

How can I link a measuring point (not a counter) to the Maintenance Plan?

Currently, I can only link a counter to a Maintenance Plan but not a measuring point.

The reason why I am asking for this is that I would like to trigger automatic creation of a work order whenever a measurement reading for an equipment goes outside the specified upper and lower limit of a measuring point. I would like to define a condition in the maintenance plan for this based on the measuring point say for example temperature.

I believe activating userexit IMRC0001 is just part of the solution. Is there something else that needs to be done?

Thanks.

Giscard