cancel
Showing results for 
Search instead for 
Did you mean: 

Creating Service Orders in SD

0 Kudos

Hello,

I am trying to determine the best way to create invoices from service orders generated in SD without having to maintain inventory for the material number used for determining the type of service. Is someone able to guide me down a path?

Thank you,

Nelson

Accepted Solutions (0)

Answers (3)

Answers (3)

VeselinaPeykova
Active Contributor

I am not sure that I understood the process flow that you adopted - is it order->billing or order->delivery->billing?

If the system performs ATP check for a service material or if you end up creating a material document at goods issue in the delivery, you probably use incorrect schedule line category.

siva_vasireddy2
Active Contributor
0 Kudos

Hi,

Maintain availability check as KP-No check in the material master

the schedule line in the order need to be CD-no Delivery

the item category need to be service Item

0 Kudos

Hi Siva,

Yes the material master under MRP 3 has a value of KP in the Availability Check field. Plant = 1039 and the material is 308-HDL-STD-CRNK ( Handle, Std, Crank) . By the way, the Availability Check with a KP value is also under the Sales: General Plant tab. Just saying.

The schedule line in the order needs to be CD-No Delivery. I am assuming you are still talking about the Material Master correct?

peter_atkin
Active Contributor
0 Kudos

Nelson,

Can you give us an example?

PeteA

0 Kudos

Hi Peter yes I can.

Material 308-HDL-STD-CRNK is extended to 15 plants. Of those 15 the only one that fails to generate a requisition at the time of an MRP run is the plant 1039. I am trying to figure out why this is the case. I have researched many possibilities but they have all concluded with not being the cause.