Hi.
I have SRM 5.0 in ECS, ECC 6.0.
All my PO must be replicated in ECC, but the error "PurchOrder < PO to number >: Enter Conf. Control "does not allow it.
The confirmation control is a field in ECC wich is necessary in the business process.
Is there in SRM a field that is related to the ECC one?
Regards.