Hi All,
I am having an error in Time Eval:
Error Description: OT performed prior to NIGT shift is still not being processed in full ie. Time Eval only processes a portion e.g. 17:30 to 21:09 instead of 1730 to 2220 even thought the full duration was specified as "approved" in IT2007
this error is faced on 21.12.2007
The DWS of this emp on 21.12.2007 is:
Night shift: 22:20 - 6:50
We are running positive time eval for him
Pls help me out in same?
Thanks,
Nithi
note:Points assured