How to do Automatic capacity leveling?

Prasath
Contributor
0 Kudos

Hi Experts,

Please guide me how to do capacity planning?

Exapmle:

Single work center is assigned to all process like (Cutting various type of cutting operation)

While running MRP planned order is created for same for all operation (Cutting)

I want to get the Planned order must scheduled.

(operation should not be in same days) like CM21 to Run automatically while running MRP

Accepted Solutions (0)

Answers (1)

Answers (1)

swathi_rege
Active Participant
0 Kudos

hi

In ecc auto scheduling is not possible..you have to do manual capacity levelling..

Auto scheduling is only possible in Apo/scm module