Two Materials in Refurbishment Order

Dear All,

I have selected two different materials (entered in component) in refurbishment order but facing problem in IW8W,in there any different scenario ??

I am dng following steps ::

1. Put back Material into store by movement type 202.(MB1A)

2. Creating Refurbishment Order

3. Issue the material from the store for your Order by movement type 261.(MB11)

4. Deliver the material back into the store using movement type.(IW8W)

5. See the status of order; it should have material delivered status.

6. Now you can close your order as per other maintenance orders.

In 4 step, it is showing only one material................Can we do refurbishment of two materials in same order.

plz guide

rgrds

DM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jan 10, 2008 at 03:30 AM

    Hi

    In standard SAP you can create a refurbishment order for one material only ,the component specified in the component tab is used for refurbishing the main material ,it cannot be returned to store since it is consumed for that order

    regards

    thyagarajan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.