I have a scenario - ! have 2 finished goods FG1 & FG2 with the same subassembly SFG. FG1 is make to stock material & FG2 is make to order material. For FG1 strategy is 11 & for FG2 strategy is 20. FG1 I can make with PIR, but FG2 can only be made when I get order. But the subassembly SFG for FG2 has to be made with PIR . Then when order for FG2 comes the PIR of SFG should automatically be reduced. for this I have used strategy 70 for SFG with mixed MRP 1 & individual/collective indicator to 2. with this strategy y SFG PIR gets consumed by the Sales order for FG2. But the problem here is my MTS FG1 is also consuming the PIR of SFG which I dont want. I want only the MTO FG2 to consume the PIR of SFG & not the MTS FG1.
Please guide me how I can achieve this?