Manual reorder point planning

114 Views

Dear all Hi,

Where can i see the PR for a raw material in the following scenario.

One of thr RM is assigned with MRP type VB, ROP as 25, lot size EX & safety stock 15.

Plant Stock is 8.

I have a requirement of FG 40 no's, i executed MD01.

As per my requirement system should generate a PR for (15-8=7) to cover the safety stock & another PR for 50 (40 reqmnt + 10 to maintain the ROP)

Please help, Thanks in advance