Dear all Hi,
Where can i see the PR for a raw material in the following scenario.
One of thr RM is assigned with MRP type VB, ROP as 25, lot size EX & safety stock 15.
Plant Stock is 8.
I have a requirement of FG 40 no's, i executed MD01.
As per my requirement system should generate a PR for (15-8=7) to cover the safety stock & another PR for 50 (40 reqmnt + 10 to maintain the ROP)
Please help, Thanks in advance