Skip to Content
0
Former Member
Jan 09, 2008 at 07:41 AM

Generation of PRs after MRP run

28 Views

We are in the Retailing business.We have a requirement of procuring rice as a raw material and packing it in 5 Kg bags.

We have created a material 3000011411- Rice bag 5 Kg EA.

We hv created a BOM for this material thru T.Code -CS01 having following components:

1.3000011406 -- Empty Rice Bag - 1 EA

2.3000011409 -- Raw rice - 5 Kg

We are doing the MRP thru MD02 for the material 3000011411.We are seeing the result thru MD04.System is generating the PR for the parent material 3000011411.

Instead we want PR for the components of the BOM i.e.3000011406 & 3000011409 to be generated.

Can u pl suggest the way out.

With Rgds.,

Rakesh Kumar

kumar.rakesh@pantaloon.com