In my BOM I have maintained the St Loc as X but in my prod orde,the St Loc comig is y ,how to change it?

tony

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 09, 2008 at 07:30 AM

    As per my understanding by default in Prod Order the SL for raw material coming is Y but you want it should be X.

    For this you have also to check in material master what SL you have maintaind in Issue SL field and also check in the work center what SL you have maintained for the suplly area.

    Maintain all these places SL as X and after then again recretae the Prod order.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 09, 2008 at 08:22 AM

    Tony,

    Can you please let us know whether Stock Determination configuration is used in your system? You can check in the material master MRP2 view whether stock determination group is assigned, If yes remove that and try.

    You can check the stock determination stuff in transaction "OPJ2".

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 09, 2008 at 07:18 AM

    Hi

    Can you explain your problem a little bit details.

    Regards

    YMREDDY

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 09, 2008 at 08:03 AM

    Hi,

    check the assignment of material to storage location in master data in transaction data such as MM02,MMSC....

    and also for avalability check setting for perticular storage location.

    reward points if useful

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 09, 2008 at 01:48 PM

    Dear Tony

    Such situation should not happen. As you are maintaining st. loc. X at BOM component level it should come in production order. And as you r telling st.loc Y is coming in prod. ord.

    Please tell me from where it is coming? I.e. Where sto. loc. Y is mentioned?

    Shivanand

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.