Hi
The Planned Order Profiles does not contain any account assignment category defined and also the requirement class (030 in my case) does not have any acc assignment category specified. After MRP run, the system defaults to the planned order type NB. Can somebody explain, how does this happen? What is the link?
Please explain and elaborate if possible.
thanks a lot.
BE.
Edited by: Brian Elfie on Jan 8, 2008 2:54 PM