Skip to Content
author's profile photo Former Member
Former Member

Upgrade of backend R/3 from 4.7 to ECC 6.0

Hi SRM gurus,

We have a client system running with SRM 5.0 and R/3 4.7 as backend. Now the client is upgrading the R/3 4.7 system with the ECC 6.0.

What we have to take care of for this type of requirement?

Kindly suggest.

Best regards,

Sridhar.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 08, 2008 at 09:43 AM

    Hi Sridhar,

    maybe the information provided in the link mentioned below helps:

    https://websmp201.sap-ag.de/srm-inst

    Regards,

    Georg

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.