Hi Guru's
first i created a cost element valid from 1.10.2006 to 31.3.2009 but my client needs the validity period from 1.4.06 to 31.3.2009.for this i entered in Ka02 but the validity period cant be in changeble mode.
for this what can i do ,,,
Thanks in advance