Skip to Content
author's profile photo Former Member
Former Member

Error at Phase TOOLIMP6_FIX in Prepare

Hi

We are upgrading from ECC 5.0 to ECC 6.0, with database Oracle 10g. We are getting an Error at Phase TOOLIMP6_FIX in Prepare module Import. After checking the relevent log files the error message is as follows:

CUSTOMER MAIN IMPORT ERRORS and RETURN CODE in B20I8A29OV.REC

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

2EETW000 Probably the data file was destroyed during file transfer!?

2EETW000 Probably the data file was destroyed during file transfer!?

1 ETP111 exit code : "8"

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

CUSTOMER MAIN IMPORT ERRORS and RETURN CODE in B20I8A2KM6.REC

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

2EETW000 Probably the data file was destroyed during file transfer!?

2EETW000 Probably the data file was destroyed during file transfer!?

1 ETP111 exit code : "8"

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

CUSTOMER MAIN IMPORT ERRORS and RETURN CODE in B20I8A2KQA.REC

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

2EETW000 Probably the data file was destroyed during file transfer!?

1 ETP111 exit code : "8"

Its very urgent, Any help would be highly appreciated. !

Thanks & Regards

Abdul Majid

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 08, 2008 at 08:14 AM

    Hi,

    Please go through this note 813658. You may have to add fix file.

    Please go through the upgrade guide phase TOOLIMP_FIX. You will get a clear idea of adding a fix.

    This note has relevent information.

    Hope this helps.

    Regards,

    Imran

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 08, 2008 at 10:54 AM

    Hi Imran

    Thanks for reply. I have checked the Note which talks about the FIX which we need to put in the PUT directory. I have all ready done that prior to starting of Prepare. The current fix files n PUT directory are :

    FIX_ERP2005SR2.UP

    FIX_ERP2005SR2.21.info

    If you mean something else fell farward it.

    Thanks

    Abdul Majid

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 08, 2008 at 11:05 AM

    Try using the fix file FIX_ERP2005SR2_24.info instead of FIX_ERP2005SR2.21.info

    Hope this might help.

    Regards,

    Imran

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 10, 2008 at 08:42 AM

    Hi.

    Please repalce tp,r3trans with a newer version and put it on /usr/sap/put/tools

    and restart the phase

    Regards

    Umesh K

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.