hi,
i had created finish material P001 , THEN Swmifinish material B001, then raw material A001 .
then i create BOM (CS01) PA001 TP BA001 .
Then BA001 to RA001.
Now i want to explode this BOM through t code CS11 or CS12.
But it not exploding , showing message , BOM for P001 does not exist.
So IS THERE ANY PP SETTING FOR EXPLOSION THROUGH CS11 or CS13