on 01-05-2008 9:26 AM
Hi
Our client faces a peculiar problem during import PO.
They are importing around 300 items and will make make just one PO for that. It means 300 line items and the import vendor is same but they have to assign the CF agent, transport, customs etc vendor one by one to each line item.
Is there any way of reducing their workload ..... how can these 300 items be transferred to the PO ( there is no PR) and how to assign the vendors ??
Any suggestions guys ??
Thank You
Hi,
i think You need to assign manually in item details for all items manually you cannot do at header level.
Thanks
Suresh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear
you can put the condition in PO header condition tab for this you have to give only once
regds
devesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
mention the same conditions at header level.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
have done tht .... but the problem is.. in import PO there are 7 diff duties .... custom duty, CVD ,edu cess, SH cess, custom edu cess, custom SH cess, and adnl duty......
plus there is CF duty, DO duty, THC ..... so they have to assign each value indivually to respective vendor 10*300 times
.. which is a tedious process....
any suggestions to reduce load