Hi,
Is there any possibility to run MRP on batch(charg) level???
Regard
Maciej B,
MRP cannot be run at Batch Level.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
MRP can be @ plant level/storage loc level and material level, but cannot be at batch level
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I'm looking for solution for variant configuration.
Example:
There is a variant configuration material (cupboard)
This materials can be produced in many different colours.
For ready product I have only one material (KMAT), but for HALB and FERT materials I would like to have one materials too.
I have wanted to prepare one material (basic material) for element without information about colour.
The colour is a characteristic in VC.
I have wanted to write information about colour on batch level.
This solution allow to have one material number for element not many many halb materials for every colour.
After some exercices it looks that this solution is not good.
The MRP doesn't know what exactly take to planing.
Maciej,
To my knowledge not possible.
Regards,
Prasobh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.