Hi,

Is there any possibility to run MRP on batch(charg) level???

Regard

Maciej B,

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

MRP cannot be run at Batch Level.

Answers (2)

Answers (2)

Former Member
0 Kudos

MRP can be @ plant level/storage loc level and material level, but cannot be at batch level

Former Member
0 Kudos

Can you elaborate your requirement...Batch means are you talking for a specific Materials under a same Batch you wanted them to run MRP?

Regards,

Nabin

Former Member
0 Kudos

I'm looking for solution for variant configuration.

Example:

There is a variant configuration material (cupboard)

This materials can be produced in many different colours.

For ready product I have only one material (KMAT), but for HALB and FERT materials I would like to have one materials too.

I have wanted to prepare one material (basic material) for element without information about colour.

The colour is a characteristic in VC.

I have wanted to write information about colour on batch level.

This solution allow to have one material number for element not many many halb materials for every colour.

After some exercices it looks that this solution is not good.

The MRP doesn't know what exactly take to planing.

Former Member
0 Kudos

Why cannot you go for material variant option in SAP.

former_member196398
Active Contributor
0 Kudos

Maciej,

To my knowledge not possible.