Hello Experts,
I have an Overhead Rate in my system. When I calculate a material costing, the system attributes the correspondent Overhead. However, when I calculate a Cost Collector, the system not attributes the Overhead. Where I could configure an Overheads Rate for Cost Collectors?
Thanks very much
Best regards,
Mary Jane