alternative items to be selected at the time of confirmation

36 Views

I maintain alternative items by using alt group in the bom.But while confirmation of parent material,the material which has the first priority is coming.but if i want to choose different material then what should i do?

first thing:

I dont want to touch bom as user dont have authorization for the same.

second thing:

can it is possible alt materials will be selected on the basis of stock avl in sto loc