Dear all,
I have met some problem about QM and PP interface, please help me take a look.
I created a process order for material, which has the been set Batch management, and then after release order, the inspection lot created which need to be batch managed. then, for some reason, I deleted the indicator of batch management in materila master, then did confirmation for order. the stock has been posted to Q-stock, which has to transfered to unrestricted stock by UD, but when I do the UD, there is a batch number must be entered.
could anyone give me a suggesion to post the stock from Q to unrestricted?
Thanks a lot.