INSPECTION TYPE 10 REJECTION IN QA32

Former Member
0 Kudos

1.Since inspection type 10 is non stock relevant , what happens when it is rejected in qa32?

2.why is that am getting lot triggered while saving the outbound delivery? and not during post goods issue?

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

Inspection type 10 is related to the delivery. The delivery cannot be PGI'ed until it has an inspection lot that passes. So if you reject the lot the delivery cannot be completed.

By default the inspection lot is created when the delivery is created. The lot is updated when the delivery is picked with the batch number if batch relevant material.

To alter the default behavior, create a QV51 record. The control of when the lot has to be completed can controlled by the QM SD Info Record (QV51).

Craig