Hello Guru's
1)In Controlling can someone explain the difference exactly betwee assessment,distribution&allocation with examples
2)can someone provide me with configuration docs to the following
-the basic controlling configuration used in any project as a standard
-Product cost config docs with screenshots&explanation
-cost center config
I need something these stuff urgently&thx in advance,points assigned
Hisham