CIF Purchase Requisition not getting CIF to SAP R/3

Dear All,

From APO Purchase Requisition are not getting CIFed to R/3.

In CIF sysfail it giving the error. Plant and storage location in the R/3 system does not exist. In APO system picking storage location which does not exist in R/3.

Please put light on this issue.

Regards

Eshan Ahmad

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 05, 2008 at 10:38 AM

    Hi,

    Recently, I had the same issue, so try with checking the R/3 customizing. In the Purchasing/ Purchase Order/ Set up Stock transport order/ Assign Document Type, you can set the doc.type you want to have the STOs between two locations.

    Hope this will solve the problem!!

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 31, 2007 at 07:24 PM

    I would recommend you to do initial transfer of Location and the Material at location as a preceding step to doing the Pur Req CIFing. Kindly also ensure that you have the location defined in the Distribution Definition(publication table) in SPRO for external procurment. Ensure the Location and the Material exist in active integration model.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.