Collective Time Confirmation of Work Orders with Proposing Actual data

Dear SAP Gurus,

We have a problem when we do Collective Time Confirmation of Work Orders with multiple Operations and multiple people assigned to every operation. If we do it by proposing the actual data, the system does not default the personnel numbers that we have set during scheduling (Requirements Assignment is done). So we are forced every time to copy the lines multiple times, and then inter the split numbers in accordance to the number of involved people, which is tedious task and cannot be grasped or welcomed by the end user. Please let me know if there is another and more simple way to do that.

Regards,

Abdullah

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.