Hi ,
In subcontarcting PO scenario please explain me the following.
I am sending x kg of material A to SC Vendor .
I am expecting y kg of Material B from SC vendor.
By product in the procedure is C.
I have maintained BOM as A material to be send A, finished assebly is B and byproducts C in cs01.
Steps Involved are
1. I sent x KG to SC Vendor . ( Explain how to issue goods to SC vendor with Movement type involved.)
2. Found that actual consumption was less than expected in BOM, So i want reverse those extra parts i sent to SC vendor.( How to reverse them and using which Movement type)
3. After completion of process i want to do GR for the Finished product XX.(How to do GR and Movement type envolved)
4.In last stage i want to recieve the by-products from the vendor.( Movement type)
5 Scrap generated in process to be recieved in companies own stock( Movement type)
5. What are various excise document which are involved if vendor sends me the finished product within subcontracting period.( 180 days)
6. What is the " Reconcillation the SC challan ? Meaning of reconcillation?
Edited by: Shreya Sinha on Dec 29, 2007 12:30 PM