Equipment master

Dear sir,

I want know the use of settlement order key for accont assignment field in Equipment master and standg order

Regards

SM.Charles

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Dec 27, 2007 at 08:00 AM

    hi charles

    Standing order

    order through which settlement of all the maintenance tasks will take place that do not have an individual order.

    Mainly used during long shutdown,you create one order and assign as Standing order,then you can confirm for this order for long period and then you can settle.

    Settlement order

    Order on which the PM order should be settled.

    This is mianly used if you want to settle the cost to the order,this will be mainly used in during construction of equipment where a Internal order will be created and assigned to the equipment,then when you create PM order the internal order will the receiver of the cost

    This order is usually an internal order from Controlling (CO).

    regards

    thyagarajan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.