Skip to Content
avatar image
Former Member

back date period open in s4 hana

Dear All,

while opening back date posting period through mmpi we go the following error message mm017- period cannot be initialised material ledger active .after reading some threads we skip the error message and open the back period . now while doing inventory posting we are getting following error message material not maintained in plant and storage location.but actually material exist in that plant and storage location even some posting already done for that.

Pls help. thanks in advance

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers