Hi All,

I have 2 queries on PRT's:

Kindly post your valuable suggestions:

Query 1:

We create PRT's as equipments and assign them in operations within a task list; then the task list is assigned in a maintenance plan; through maintenance plans orders are relaesed based on scheduling paramaters.

My question is, supposing two orders are released through two different maintenance plans at the same time in which a same PRT is assigned, then I cannot obviously use the PRT in both the orders. Isnt't it?

If that be the case, then system should be able to tell that the PRT usage is restricted or cannot be used in the second order.

Is there a way to do this in system?

Query 2:

In an equipment (test equipment) tasklist with inspection points (300), I can assign PRT's as master equipments for the calibration.

When calibration order is released through a maintenance plan, inspection points are released. While doing results recording, I expect the system to prevent me from doing results recording if the validity of the master equipment (PRT) is expired.

Is there a way to do this in system automatically?

Many thanks in advance.

Kannan J