Hello all,
My client is upgrading from 4.6 to ECC 6.0 with XI replacing the existing SEM system between the legacy and the SAP systems. Now, the Basis consultant is doing the XI configurations in the ECC system. Can someone please tell me how can I make sure if the XI configurations are done correctly to start working on the XI system? The basic XI system is configured, but I try to launch the integration builder, I get nothing on the screen. What configurations hav to be done by the Basis person to make this work?
Early correct answer gets rewarded.
Thanks in advance.