Skip to Content
0
Former Member
Dec 20, 2007 at 03:15 PM

Problem in Production as Login Credentials changed

26 Views

Hi,

This is a scenario from IDOC to JDBC.

This is a case arised due to blocking of the id, which we were previously using in XI for getting connected from R/3 systems, ie the RFC destinations from R/3 to XI were using that login credentials.

So the scenarios failed.

Again we reset the ID with the same password. But the scenario is failing.

The idocs are reaching to XI , but the the pipeline steps are not executed. It is saying " INBOUND INTERFACE NOT FOUND"

This is a problem in Production, and we ve not touched any interface or mapping.Previously the scenario was working fine.

Pls give me the solution and we 'll give 500 points:-)

Regards,

Navneet