Rework order

Former Member
0 Kudos

Dear Gurus,

How can I create a manual rework order with reference to the existing production order. I don't want to use the trigger point. Without using any trigger points, with reference to the original production order I want to create a rework order. All the costs incured in the rework order should reflect in the original order. If any body is having the idea regarding setting/tcode...please let me know.

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Kodand Nag

Go to CO07-production order creation w/o material

Order type-PP02

Press Enter

enter in the component same material for which you are doing rework and assign to production order so that cast will eb settled to that production order

Then do the other activities as usaul(GI,Confirmation,GR)

Settlement will happen to the original order

Settlement process

In this case the costs for the rework are updated with the confirmation of the operations on the new order. When you settle, these costs are passed on to the original order.

When you calculate the variances, the settled costs of the rework order are shown in the original order under the usual variance categories.

If you settle the rework costs of the separate production order under a settlement cost element to the original production order, you can identify the rework costs through the settlement cost element. In the variance calculation process, the rework costs are reported as a resource-usage variance in this case.

Note that the receiving production order should not be deleted or archived until the rework order has settled to the original production order.

Hope this is useful

Revert back if you have any further queries

Reward points if useful

Regards,

SVP

Edited by: SVP on Dec 19, 2007 2:39 PM

Former Member
0 Kudos

Dear SVP,

then only link between the original order and rework order is settlement rule. In the settlement receiver I need to give the old order number... and receiver category is ORD. Please confirm me. Is there any other way to link the original order and the rework order...please let me know.

Regards.

former_member196398
Active Contributor
0 Kudos

Nag,

As explained by SVP, settlement rule is the only link through which the cost of Rework order can be transferred to original order by settlement.

You are right you need to give the old order number as settlement reciever.

Regards,

Prasobh

Former Member
0 Kudos

Nag,

As already told by Mr.Prasobh thats the only way you can link to the parent order

Hope your doubts are clarified

Reward points n close the thread

Regards,

SVP

Former Member
0 Kudos

hi SVP,

How I can assign the rework order to orignal production order in CO07.

it is necessary to create Seperate Routing for rework operation?

Rgds.

Former Member
0 Kudos

Hi SVP

For Rework Order -- order Type is PP03 not PP02

Am i correct..

Regards,

srihari

Former Member
0 Kudos

Hi SPV,

As per ur instruction, I use the T-code CA07.In that i give input as Plant & order type(for Rework order)i.e.specially created.

After Enter I give inputs as Material discription,Qty,Unit,Basic date & sceduling type.Here Order & material fields are Gray(disable).

On Enter for the further screen it shows the following Error Message

"No task list for select.ID 01 for auto. task list selection found"

Message no. CP010.

What is meaning of that,it required any Customisation setting?

How can i proceed?I have Prod.order of 60 nos.out of which 5 were rejected at the 1st operation.Operation no. Start from 10 to 90.

Plz reply.

Rgds.

Former Member
0 Kudos

Hi SPV,

As per ur instruction, I use the T-code CO07.In that i give input as Plant & order type(for Rework order)i.e.specially created.

After Enter I give inputs as Material discription,Qty,Unit,Basic date & sceduling type.Here Order & material fields are Gray(disable).

On Enter for the further screen it shows the following Error Message

"No task list for select.ID 01 for auto. task list selection found"

Message no. CP010.

What is meaning of that,it required any Customisation setting?

How can i proceed?I have Prod.order of 60 nos.out of which 5 were rejected at the 1st operation.Operation no. Start from 10 to 90.

Plz reply.

Rgds.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

rework order you can create by defining control key in routing ,or else you can create order type separate for rework activity for that master data you define it first.

like regular order you can define rework order by putting rework order type and post the document

when you confirm that rework operation there you put your remark against whch production order you are doing rework activity.

reward points if you useful to you.