Hi,
We have a requirement where we need to divert the Materials to different Storage location in MB01 depending on following conditions:
a) If Received quantity for Material A is more than 10000, change Storage location during GR from 1 to 2.
b) If no.of receipts done on Material A are more than 10 then change Storage location during GR from 1 to 2.
Storage location 1 - Storage location in PO
Storage location 2 - Quality check storage location
2 modules come into picture here, QM and MM.
Is there a standard way of doing this in QM or MM?
I think there should be as every company which uses Quality Management should divert goods to some storage location depending on some conditions while receiving.
Thank you,
Jagadish