Hi all.

I have a configurable material with a BOM say X

Beneath I have two levels of configurable materials and on the third level I have a Fert material.

Material Y is a variant of X. On the sales order (while exploding the material Y) I have all the levels of the BOM ; but I only want to show the FERT material which are the only ones relevant to pricing and delivery.

I' ve tried with phantom assembly but is the same; maybe I,m doing something wrong.:-p

10x.