REM - BLPR - Table

Former Member
0 Kudos

Hai PP gurus,

When i access the table BLPR , system displays the followig message.

No table entries found for the specified key.

So my doubt is when system will update this table or how to access the table to display the stored value. Please guide me.

Thanks & regards,

S.Ganeshraja

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Dear PP Gurus,

Top contributors, Pls share your valuable thoughts reg this issue.If you share , it will be very usefull for me.

Thanks in advance...

Regards,

S.Ganeshraja

Former Member
0 Kudos

Hi Ganesh,

As we already discussed in eariler therads , u canot trace the planned order once u done the confirmation in MFBF.

please letus know the reason for u need planned order so that we can try with some other way if any

Regards

Pradeep

Former Member
0 Kudos

Dear Mr.Pradeep,

Thanks for your reply. I will come back to you very soon.

Regards,

S.Ganeshraja

former_member184655
Active Contributor
0 Kudos

Dear Ganeshraja,

For Document Logs related to REM - Planned order,

Check in tables

BLPK Document log header record

BLPP Document log item.

Upto my knowledge only these 2 tables are getting updated

and BLPR updation is not happening or I dont know when this

it gets updated.

So check with the 2 tables which I have mentioned.

Regards

Mangal.

Former Member
0 Kudos

Dear Mangalraj,

What you said is exactly correct. But i want to link the document log or item with reference to planned order. Thats why i checked that table(BLPR). Becoz in that tables (BLPK & BLPP) there is no link between planned order. So how to track the document log with reference to planned order. Is it possible with std or how to map this one? Pls give some logic...

Thanks & regards,

S.Ganeshraja

former_member184655
Active Contributor
0 Kudos

Dear Ganeshraja,

I dont think its possible,Once the production booking is done

against a planned order(equal to that Planned order

quantity),it's removed from the system.

Even though the production booking (MFBF) is carried out

planned orderwise,this is not getting reflected anywhere,even

In MF12,check the documents log,after changing the layout

by selecting the Planned order backflush,the planned order

number does not gets captured.

So I dont think its possible Ganesh,If you come across such

work arounds,please share in SDN.

Regards

Mangal

Former Member
0 Kudos

Dear Mr.Mangal,

Thanks for your reply. Any other possible ideas....

Thanks & regards,

S.Ganeshraja

Former Member
0 Kudos

Dear Raja

I think you want to check the planned order(RSQ) details with log & explosion details etc

Have you got any planned orders ,I mean have you enetered any demand & run MRP

Revert back on this

If you havent done then do it to get some data

Regards,

SVP