on 10-23-2017 2:28 PM
We are using overall release in PR. We are facing an issue when in a PR one line is cancelled. The overall release in tcode ME55 is not working and requires through a message to go to single linen release which is an unwanted situation. What do we have to do to get thos PR with cancelled line in Overall release tcode?
in 4.7 release was this behavior an error and got fixed with OSS note 668940 - ME55 : collective release does not work with ALV grid
Now there is a KBA explaining it is standard design 1658074 - Unable to release requisition in transaction ME55