Skip to Content

two confirmations (RUECK) with one document number (MBLNR)

hello colleagues,

can someone explain to me why the systeme generates two confirmation references for the same confirmation throught COR6N.

thanks a lot.

Alaaeddine.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Dec 05, 2017 at 02:49 PM

    Hi,

    I find it, this behaviour is generated when I confirmed, partially, the production order, than I modified the quantity in the production order and confirmed it again, tow confirmation number have been created.

    BRs.

    Alaaeddine.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 25, 2017 at 09:55 PM

    Hello Alaeddine,

    can you please elaborate what kind of production order this confirmations were posted to?

    Can this be some sort of a combined order, or a network?

    Thanks and regards,

    Stefan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.