on 12-15-2007 12:15 PM
Hi PP guru,
i have a finished product having safety stock of100 cv, pir is 100 , when we run MRP system create two Planned order 100 cv each for safety stock & pir, i want only one , how we can do ?
Pl suggest.
Vikas
Dear,
Check the lot size. MB is a monthly lot size and if you want to get 1 planned order for 200, then you need to change the lot size to monthly i.e. MB, so that system will create one lot for each month.
please come back with following data
What is the stock available?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
During procurement proposal the system will look for available stock it will the safety stock from that. It will not consider the stock upto safety stock level as available stock. If the demand is more than this. then the system will create plan order based on the your lot size and rounding profile.
If you want this safety stock as to be included in available stock. You have to do setting the MRP group % of safety stock will be considered as available stock.
Regards
J.Saravan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vikas,
Can i know what is the lot size that you have specified for the material.
Anshul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please check the planning strategy used. For eg if it is 11, then stock will not be taken into account during mrp run.Hence for all the requirements pl. orders will be created during mrp run.
Regards,
Senthilkumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.