Dear experts.

In SAP documentation it says:

"Usually, the two procedures, posting the goods receipt and the status change "set kanban to full" are linked. This means: When the status is changed the system automatically posts a goods receipt for the material in the background. It is also possible the other way round: if a goods receipt is posted for the material that is controlled using KANBAN, then the status is automatically set to FULL."

Could you plz explain about the proper setting to carry out the bolded part of the instruction?

best regards

farzad salimi

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Jürgen L
Oct 22, 2017 at 09:38 AM
0

And directly next in the documentation it is said: "in the control cycle (via the selection Separate GR ), you can define that the goods receipt posting and the status change (kanban to FULL) are to be carried out independently of each other."