Is pre-selection gets reset during BOP or VKM3 in RBATP scenario

I have a similar requirement.

But when we have made pre-selection active, the selected proposal was getting reset when RBATP was happening thru either VKM3 or BOP.


Also as given in the example, we need 4000 nos (Order Qty) to be confirmed from a single plant where it is fully available (substitute loc "Y" in the given case) or keep the SO line open (unconfirmed) till full quantity doesn't become available at any of the plant.(location).


Can you kindly guide

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 18, 2017 at 08:38 AM

    Sorry the requirement doesn't appeared correctly , hence giving the scenario again -

    Here is the requirement:

    The to total stock of the product A at the location X is 2000

    and the the total stock of product A at the substitute location i.e. Y is 5000

    Now when I create the order with 4000 requirement quantity, as per the location substitution rule the confirmation as below

    Product A confirmed quantity at the location X is 2000

    Product A confirmed quantity at the substitute location Y is 2000

    But my question here is can I change the confirmed quantity (deliver proposal) of product A at the location X to zero and can the remaining full quantity which is 4000 to be confirmed from the substitute location Y. If yes HOW?