Dear pp gurus!

when i converted to planned order to production order system shows relese rejected. when i see the error goto-logs-release.system shows number range is not defined.

how to solve this problem. plz explain with detail procedure

thanks

manoj kumar

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Srikanth,

Ur problem got resolved?

Just clarify me one thing- by reading your problem what i have understood is tht

you are able to convert the planned order to production order but you are not able to release it-is it so?

Also give the details of the error-Number range for what is not maintained,if possible send me the screen shot

Regards,

SVP

Former Member
0 Kudos

Hi,

you have to define number ranges to your defined order type.

reward points if you find it udeful to you.

Former Member
0 Kudos

hi AMA

number ranges alerady assigned for order types. but same problemwas came

thanks

manoj

Former Member
0 Kudos

Manoj,

Have you created new order type or using the standard one?

While converting check which order type is picked by the system

If you have created the new order type then that order type need to be assigned to the plant in OPL8

Check n revert back

Regards....

SVP

Former Member
0 Kudos

hi svp!

i created new order type.and assign this order type in plant. in opl8 also rooting selection -3 and selection id -01. but problem not solved

thanks

manoj

former_member184655
Active Contributor
0 Kudos

Dear Srikanth,

First check your settings for an order type.

1.Define Order Types – OPJH.

2.Define Order Type Dependent Parameters – OPL8.

3.Define Status Profile – BS02(Not a must)

4.Define Selection profile – BS42.( not mandatory)

5.Define Number Ranges for Orders – CO82.

6.Define Number Ranges for Confirmations – CO80.

7. Define Number Ranges for Reservations – CO83.

8. Define Number Ranges for Operations – CO81.

9. Define Number Ranges for Capacity Requirements – CO84.

In the first post you have said number ranges not maintained,so check with the

above T codes and work ahead.

What you have mentioned is related to order type dependent parameters,where it

will show problem related to picking of routing & BOM.

Regards

Mangal

Former Member
0 Kudos

Hi

Check for ur order type/plant business transaction 2 in OPJK the field mat release,If the mat shortage is there system won't allow u to release the order.

Gopi

Message was edited by: