Skip to Content
0
Former Member
Dec 06, 2007 at 05:18 AM

Work schedule rule generation dates

65 Views

Hi All;

I need to create a report which displays the generation dates (from and to) of a work schedule rule. I have managed to find out that the generation dates in t-code PT01 are stored in structure PSHFT ( PSHFT-PRD01 and PSHFT-PRD01 ).

Is there a table in which these fields are stored in?