Hi,
Is there any way to determine Alternate Parts at the time of Goods Issue through T Code MB26 based on stock availability ? Have anyone faced this requirement and is it achievable through any workarounds? Alternate parts are maintained in the Bill of Material.
Raj
Hi,
In BOM alternative items are assigned to alternative item group on the general
data.
In the production order in the general data tab page.
We can define the alternative item based on priority , strategy and usage probability.
Priority:
This defines the priority of the item within the alternative item group.
This determines the priority of planned withdrawls of items.
EX Two items are assigned to alternative item group
item A Priority 1
item B Priority 2
The system reads the item A first.
Strategy:
use the strategy to determine how the planned withdrawl is controlled
within the alternative item group.
The strategy should be same for all alternative items within a alternative
item group.
If the value 2( 100% check) is defined for the strategy the first material in
the defined priority sequence for which sufficient quantities are available
are reserved.
Usage Probability:
MRP Plans these alternative material components according to probability
of use.Material requirements for BOM Components are planned according
to usage probability.
The planned withdrawls for the production order are based on the
reservation lists.These lists are based on the priority and strategy.
Regards,
nandha