control of service PO

Hi,

When a Service PR is generated it has 1 AU at the header level qty where as it as service line item at the Service level with each service item having some qty. Now once this PR is adopted to create the PO, if user changes the qty at Service level item on the higher side also system does not gives error. How do I control this? I understand that since as per System 1 AU at the header level is the qty for PR and even if user changes the service level qty, header level remains as 1 AU only. How can put some control on this.

Thanks in advance

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2007 at 09:09 AM

    Hi,

    Try and control by release procedure by charactersic as PO value and have control over PO value changes.

    Thanks

    Suresh

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      Sorry i misread as value instead of qty.Try and see whether u can control by keeping qty field in display mode by creating seperate PO doc type.

      Instead also try and check whether it can done with authorisations with basis consultant.

      thanks

      suresh

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.