When I run the CCR, I get these messages that the planned orders exist in APO but not in R/3:

Missing in R/3 Without External Key Error code 153

Missing in R/3 With External Key Error code 154

Can someone please tell me what is this with and without means? Whar are probable reasons for this. In CCR it shows the solution as "DELETE IN APO" But as these orders are not flown to SAP R/3 and we need them.

Cheaked Material master Special Procurement Key is maintained for plant.

Material exists in Active integration Model, Validity period is maintained,

Can any body tell me how can make then SEND TO R/3

Thanking In advance .

Amol Chavan

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Dec 05, 2007 at 12:36 PM

    Check the SMQ2 Inbound Queue to R/3 and see the details.

    Do you have Integration Model active for Planed Orders?

    If you have it active then most likely there is some master data issue because of which the transaction data is not getting created in R/3.

    Hope this helps.

    Somnath

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.