A project PO created using an opex material code. Fixed asset team can not perform settlement. Error message: complate allocation structure Z1 (Message no. KD503). How do we resolve this problem?

thanks Anitha.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Dec 05, 2007 at 09:06 AM

    Hi

    Get into T.code OKO6

    Select your Allocation structure Z1 and check for the Source,Assessment Cost Element and Settlement cost elements under Assignments.

    Maintain the required entries and run the settlement.

    Hope it should resolve the issue

    Good Luck

    Hari

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.